First Implementation Ticket

Assigned: Thu Oct 15 · Review-ready: Thu Oct 29 · Merged and verified: Wed Nov 4 · Feeds: a Pass requirement, and evidence toward the Distinction requirement a feature owned end to end

Overview​

Onboarding taught you to read the codebase, by cutting one vertical slice through it. This one is about owning a change to it, and unlike onboarding, this one ships.

The difference is the last two steps. In onboarding your work ended at a pull request that never merged. Here it ends when the change is running, behind a course feature flag in your team's demo class on staging, and you have gone and looked at what happened. Deploying it is part of the assignment. So is what you do if it goes wrong. Every project you do after this is a longer version of this loop.

Learning Outcomes​

By completing this assignment, you will:

  • Take a change from problem through design, implementation, review, merge, deploy and observation, including the stages on either side of writing the code (LO3)
  • Design for operability with a test that fails without your fix, a rollback sentence you could execute, and a flag if the change is user-visible and unfinished or potentially breaking (LO5)

Picking one​

Leave Demo Day 1 knowing your ticket. You pick it in class on Oct 15, after the demos, while Jon is in the room to agree scopes. It has to be XL, and by Mon Oct 19 the scope has to be agreed with Jon in a comment on the issue.

Start from your own project​

Most of you should take a ticket from your own project. You spent the async sprint investigating one thing in your team's area, and that artifact, together with your Agents Activity analysis, is where this ticket comes from. You know something about your project now that you didn't know on Oct 1. The most useful version of this assignment is shipping the change your own investigation says is worth making.

Good places to look: the issues your team filed at the end of the sprint, the "for the team" or "next" section of your sprint artifact, and the tickets your Agents Activity analysis proposed. If the ticket doesn't exist yet, open it in class and tag Jon.

Steps 4 to 6 of the Agents Activity are a good way to scope it. Plan it as a stacked series of PRs that you can each review line by line. Two tests for whether it's XL:

  • It touches more than one layer. A UI change and the query behind it. An edge function and the schema it reads. A CI workflow and the test it runs. If it lives in one file in one layer, it's too small.
  • You can say what "done" looks like in one sentence, and that sentence mentions a user. If you can't, you don't understand the ticket yet. That's fine on Oct 15 and a problem by Oct 19.

Or the pool​

If you already claimed an XL pool ticket during the Agents Activity, that's your first ticket. Keep it, and you're done picking.

Most of the cs4535-first-ticket pool was claimed that way. As of Oct 14, two XL tickets are still free: #467 (An extension grades work the student already pushed) and #1026 (Course settings update live without the expensive database watcher). Claim one by commenting on it. You may not claim a pool ticket you filed yourself.

Another open issue, or something you tripped over while building column groups, works the same way as a ticket from your own project: it counts once Jon agrees on the issue that it's XL.

Why Oct 19​

You have two weeks, and Game Day 1 lands in the middle of them on Oct 22. A ticket chosen on Oct 24 gets four working days. Four days is how you end up opening the PR at midnight on the 28th, with nothing reviewable at Demo Day 2.

What end to end means​

The checklist below is not ceremony. Every line on it corresponds to something that has broken a deploy on this codebase.

  1. A branch, cut from current staging, pushed either to pawtograder/platform itself or to your fork. Both get the full CI run, including the end-to-end tests, as long as you have write access to the platform. A branch in the repo also gets a preview deploy automatically; a fork PR gets one when someone adds the preview label. Local Development covers what CI does with your PR, along with the commands to run the same checks locally first.
  2. A PR description that says what changed, why, and how you tested it. If a reader has to open the diff to find out what the PR does, the description isn't finished.
  3. Tests where the change warrants them. A bug fix gets a test that fails without the fix. That case is not negotiable, because it is the only proof you fixed the thing you think you fixed. Other changes should say in the PR what they test and what they deliberately don't.
  4. CI green before Oct 29. Your assigned reviewers start then, and a red PR spends their attention on your build.
  5. A rollback sentence. One line: if this turns out to be wrong in production, what do we do? Revert cleanly? Flip a flag? Fix forward with a migration? Writing this sentence changes the design more often than you'd expect. A change with no clean revert is a different change.
  6. Review-ready by Thu Oct 29. Steps 1 to 5 done on every PR in the stack, and the preview deploy working. That's what you demo at Demo Day 2.
  7. Two assigned reviewers. On Oct 29 Jon assigns each stack two reviewers through the Code Review 1 assignment in Pawtograder: one teammate and one from another team. Their reviews are due Mon Nov 2 at 10:30, before class. As code review explains, there's no TA tier, so these two reads are most of the review your PR will get. You'll review two stacks yourself.
  8. Address the review within 48 hours. Don't just comply with it. If a reviewer is wrong, say why, with evidence. Quietly force-pushing over a comment is the one behavior on this list that is a real problem. Everything else here is a rough edge.
  9. Jon merges to staging, then you watch it deploy. Once both reviews are addressed, Jon does a last read and merges. Merged and verified by Wed Nov 4. Confirm it is live in your team's demo class. Click the thing. The instructor promotes staging to production periodically, so this is the last gate before real users see it. Then post the verification in your team's channel: the PR link, the deploy timestamp, and what you clicked. That post is the evidence for this requirement.
  10. A course feature flag, if the change is user-visible and unfinished or potentially breaking. Not every ticket needs one, and reaching for a flag you do not need is its own mistake: a flag is a promise that something is incomplete, and a codebase full of flags nobody retires is worse off than one with none. Over fifteen hundred people use this product every week, though, and not one of them agreed to test a half-built or half-validated feature.

Steps 9 and 10 are what this assignment has that nothing you have submitted before did. There is no "turn it in." There is "it's live, and I went and looked."

If it goes wrong after it ships​

Then fixing it is part of this assignment, not a separate misfortune that happened to you.

Revert first, diagnose second. Reliably Releasing Software, back on Sep 17, is about precisely this. Re-read it before you deploy. A change that you shipped, broke, reverted inside the hour, and landed correctly two days later is a better submission than one that happened to work the first time. Put all of it in the PR. That history is the most interesting thing about your submission.

If it doesn't merge​

Some tickets are bigger than they look. Sizing a ticket you have not opened is guesswork, and the guess is sometimes wrong.

What passes: you took a ticket, worked it, found the reason it was larger than advertised, wrote that reason down in the issue, scoped down to something shippable, and shipped that instead.

What doesn't: silence. A ticket you sat on for two weeks and mentioned to nobody is the exact failure this assignment is built to catch. The missing feature does less damage than the missing information. The thirty-minute rule in the syllabus exists for this, and two weeks is a lot of thirty minutes.

If an assigned review hasn't come by class on Mon Nov 2, tell Jon in class. A PR that was review-ready on Oct 29 and then waited on somebody else meets this requirement on the date it was ready. What you have to be able to show is the timestamp: the PR was green and described. Waiting quietly isn't the same as waiting on someone.

Grading Rubric​

Merging and deploying this is a Pass requirement. Steps 5, 9 and 10 are the rollback sentence, watching it deploy, and the flag. Doing those three well is most of what the Distinction requirement a feature owned end to end is asking for. The piece this assignment does not require, and that requirement does, is the dashboard or query you would actually check afterwards. Add one and this ticket carries the whole requirement.

ExpectationStandard
ScopeTouches more than one layer; lands as one reviewable PR, or a stacked series with a stated plan
PR qualityWhat, why, how you tested, and the rollback sentence, all present before review is requested
TestsA bug fix has a test that fails without it; other changes justify what they cover and what they don't
ReviewReview-ready by Oct 29; both assigned reviews answered within 48 hours; disagreement argued with evidence
LandedMerged to staging by Nov 4, and you verified it running in your team's demo class
OpsUnfinished user-visible work sits behind a flag

What strong looks like​

The description tells you what the change does without opening the diff. The rollback sentence is specific enough to execute at 2am by someone who has never seen your code. A reviewer asked a question, you disagreed, and the thread ends somewhere better than either of you started. It deployed on Nov 3 and you said so in your team channel.

What weak looks like​

A PR opened Oct 29 at 9:00. "Fixed the bug" as a description. Tests that assert the implementation and never check the behavior. A green CI you obtained by deleting the assertion. A merged PR you never confirmed had actually deployed. A ticket that turned out to be fixed by somebody else's PR two weeks earlier, which reading the issue would have told you.

Dates​

Assigned at Demo Day 1Thu Oct 15
Know your ticketend of class, Thu Oct 15
Scope agreed on the issueby Mon Oct 19
Game Day 1, mid-windowThu Oct 22
Review-ready, demoed at Demo Day 2 from the preview deployThu Oct 29
Code Review 1 assignedThu Oct 29
Reviews dueMon Nov 2, 10:30 (before class)
Review addressedwithin 48 hours of each review
Merged to staging and verifiedWed Nov 4